- Home
- Wedding 1974
- Anchorage Alaska - IRMA Conference 2000.
- Canada IRMA Conference 2001
- Shanghai China
- Holiday USA - 1999_2000
- New Zealand June 2 to 23, 2012
- Building our home
- Clearing the block
- Setting out the profiles
- Constructing the garage
- Laying the concrete blocks
- Drilling stump holes
- Floor Bearers and Joists
- Slab under the house
- Kit arrives
- Laying the floor
- Assemble wall frames
- Roof Trusses
- Timber Posts
- Back veranda
- Guttering and Roof
- Doors, windows and cladding
- Timber decking
- Ramps
- Fitting out - January 2006
- Electrical and Data
- Plastering and wall insulation
- 3 phase power and telephone
- Jobs around the house
- Wet areas
- Aqua Nova environmental toilet
- Stormwater pipes
- Painting
- Electrical & Solar Tube
- Cabinet Assembly
- Floor & Wall Tiles
- Garage Doors
- Finishing off work
- Moving in
- Inside our home 2006
- Inside our home - 2007
- Outside our home - 2007
- Outside our home - 2008
- Outside the home - 2009
- Outside the home - 2010
- Outside the home - 2011
- Outside the home - 2012
- Uganda Mission - 2008
- Uganda Mission - 2010
- BushCaddy R80
- Google Maps
- Contact Us
The all metal BushCaddy R80 kit arrives on Monday 29 February 2001 ready for construction.
The costs associated with the purchase, shipping and delivery from the Bushcaddy factory in Canada to my workshop in Kureelpa on the Sunshine Coast in Queensland Australia was $34,253.39.
|