- Home
- Wedding 1974
- Anchorage Alaska - IRMA Conference 2000.
- Canada IRMA Conference 2001
- Shanghai China
- Holiday USA - 1999_2000
- New Zealand June 2 to 23, 2012
- Building our home
- Clearing the block
- Setting out the profiles
- Constructing the garage
- Laying the concrete blocks
- Drilling stump holes
- Floor Bearers and Joists
- Slab under the house
- Kit arrives
- Laying the floor
- Assemble wall frames
- Roof Trusses
- Timber Posts
- Back veranda
- Guttering and Roof
- Doors, windows and cladding
- Timber decking
- Ramps
- Fitting out - January 2006
- Electrical and Data
- Plastering and wall insulation
- 3 phase power and telephone
- Jobs around the house
- Wet areas
- Aqua Nova environmental toilet
- Stormwater pipes
- Painting
- Electrical & Solar Tube
- Cabinet Assembly
- Floor & Wall Tiles
- Garage Doors
- Finishing off work
- Moving in
- Inside our home 2006
- Inside our home - 2007
- Outside our home - 2007
- Outside our home - 2008
- Outside the home - 2009
- Outside the home - 2010
- Outside the home - 2011
- Outside the home - 2012
- Uganda Mission - 2008
- Uganda Mission - 2010
- BushCaddy R80
- Google Maps
- Contact Us
Stage 1: The construction of the garage (November 2004) which is the only
part of the house made of concrete blocks and concrete floor. The rest of the
house is made of steel.
One
of the best and most used tool/instrument we purchased and used constantly was
the last level. Bebbington
earth moving and excavating was contracted to dig the footings.
Finally the footings are poured and ready for the next stage, laying the concrete blocks that will form the wall.